Manufacturing time
An A350-1000 aircraft takes 9.5 days to be made. If I lease or buy 100 aircraft this would take 950 days or 2.6 years in real time. Is it possible for the airline to pay some cash to the manufacturer to increase its infrastructure and decrease the manufacturing time of the aircraft?