Two aircraft scheduled for delivery on one day
Relevant ID
12727, 12728
Description
I ordered five E195s. Instead of all being delivered 2.4 days apart after a 4.9 day lead time, the first two aircraft are scheduled to be delivered at the same date and time (April 21st 2018, 10:40AM). The other aircraft are then scheduled for April 26, then May 1st and May 6th. This seems to have differences of the lead time instead of the build time, which is similar to the other related bug report recently posted to the tracker.